mailtomail@emamidesign.de
phone+49 (0)30 479 87 654

Design to Cost (DTC)

Fundamentals & Design Process

What does Design to Cost mean?

Design to Cost (DTC) is a development approach in which a defined cost target is treated from the outset as a real constraint in concept, design and technical implementation. Costs are therefore not checked only at the end of a project; like packaging space, function, weight or performance, they are developed continuously throughout the process.

DTC is relevant to Industrial Design because many costs are shaped by early decisions: part count, material, geometry, surfaces, manufacturing process, tolerances, joining methods, assembly and variant structure. Later savings can often correct these fundamental choices only to a limited extent.

How does Design to Cost differ from subsequent cost reduction?

Subsequent cost reduction often starts with an already defined product and then looks for less expensive materials, processes or components. Design to Cost works earlier: the cost target already influences selection of the product concept and architecture.

This helps avoid economically unfavorable solutions before they are highly developed in formal and technical detail. DTC does not, however, mean choosing the cheapest option by default. The objective is to develop a product whose intended functions and quality targets remain achievable within the economic framework.

Which design decisions have a particularly strong influence on cost?

  • Number and complexity of parts.
  • Material selection, material quantity and required surface finishing.
  • Manufacturing process, tooling effort and expected production volume.
  • Tolerances, fits and requirements for visible gaps.
  • Joining methods, assembly sequence and automation potential.
  • Variants, common parts and platform content.
  • Packaging volume, logistics and, where relevant, service or repair concept.

Why does DTC depend on production volume?

A cost target cannot be considered meaningfully without production volume. A CNC-machined housing, for example, avoids high tooling costs but may create significantly higher unit costs at large volumes. Injection molding or die casting, by contrast, require early investment and stronger manufacturing constraints, but can become economically advantageous at higher volumes.

DTC therefore evaluates not only the unit price of a component, but the cost logic of the intended production scenario. This includes investment, unit costs, scrap, assembly, rework and the economic consequences of variants.

How does DTC differ from Design to Value and Value Engineering?

Design to Cost uses a cost target as a development framework. Design to Value focuses more strongly on which characteristics create value from the perspective of users, customers or the market and where costs should be invested deliberately. Value Engineering or Value Analysis systematically examines the relationship between function and effort.

In strong projects, these perspectives complement one another. A cost target prevents economically unviable solutions; the value perspective prevents the removal of precisely those features that influence purchase decisions, use or perceived quality.

How can Design to Cost avoid making a product look “cheap”?

Cost reduction and perceived quality are not necessarily opposites. Reducing part count can calm visible gaps, simpler assembly can increase precision and material-appropriate form can avoid finishing steps. The key is to reduce complexity where it creates no functional or perceived value.

DTC becomes problematic when only individual prices are considered and effects on durability, use, surface quality or brand are ignored. Good cost-oriented design protects value-creating features and simplifies the rest.

Related EMAMIDESIGN Services

Product Design · Redesign & Product Optimization · Cost Optimization · Engineering Support · DfM Support · Material Selection · Production Consulting

Related terms