Industrialisation & Series Production
A pre-series or pilot series is a limited production run carried out before regular series production begins. Its purpose is to test the product and the production system together under realistic conditions. Unlike an individual prototype, it evaluates not only components but also manufacturing, assembly, inspection, material flow and organisational processes.
The terms pre-series, pilot series, pilot run and pre-production run are not used completely consistently across companies and industries. A project should therefore define the required maturity level, production conditions and approval criteria associated with each run.
Small-batch production primarily describes limited production volume and may be a regular manufacturing model. A pre-series or pilot series, by contrast, describes a development and industrialisation phase with a clear validation purpose before regular series operation.
A product can therefore remain in small-batch production permanently without ever transitioning to mass production. Conversely, a pilot series may comprise relatively few parts even when very high production volumes are planned afterwards.
The distinction is not fully standardised in practice. In the EMAMIDESIGN glossary, a pre-series or pilot series is treated as an earlier near-series validation stage in which production processes, assembly, inspection and logistics can still be deliberately optimised. The zero series is closer to the intended final series condition and serves as a final comprehensive validation before regular ramp-up.
More important than the terminology is the exact definition of the milestone: Which tools are being used? Which suppliers and series materials are already fixed? Which tests must be passed? Which deviations are still permissible?
Not necessarily. Individual processes or equipment may still be provisional if their suitability is precisely what the pilot phase is intended to test. Transparency is essential: deviations from the later series condition must be known so that the results are not interpreted incorrectly.
The closer the project moves toward approval, the more closely materials, tooling, suppliers, inspection equipment and assembly conditions should represent the intended production process.
No. The appropriate quantity depends on which process risks need to be investigated. A new assembly sequence may require a different number of units than the evaluation of a tooling process or a product family with many variants. A meaningful pilot run is therefore planned around validation objectives and process scope rather than a generic quantity.
Product Design · Prototyping · Engineering Support · Production Support · Quality Assurance · Series Production & Market Launch