Requirements Analysis captures, structures, evaluates and prioritizes the conditions a product is expected to fulfill. It translates project objectives, user needs, technical constraints, economic targets, manufacturing conditions and regulatory requirements into a traceable basis for development.
In product design, it connects an often still broad design brief with concrete design decisions. It makes visible what must be fulfilled, what is desirable, where conflicts exist and which points still need to be verified.
ISO/IEC/IEEE 29148:2018 defines a requirement as a “statement which translates or expresses a need and its associated constraints and conditions”. The core idea is therefore not an arbitrary wish list, but a precise translation of a need together with the associated conditions and constraints. (Source: ISO/IEC/IEEE 29148:2018, 3.1.19)
The standard originates in systems and software engineering, but it is equally relevant to complex physical products because requirements also need to be elicited, analyzed, documented, verified, validated and managed across multiple disciplines.
An objective describes what should be achieved - for example a lighter, repairable or more intuitive product. A requirement specifies that objective far enough that fulfillment can be assessed. A constraint limits the solution space, for example through existing components, a maximum installation width, a prescribed material or a regulatory threshold.
This distinction matters because objectives often need room for interpretation, while constraints may be genuinely binding. When the two are mixed, assumptions quickly become seemingly immutable specifications.
A good requirement should be understandable, unambiguous, necessary, feasible and verifiable. Wherever possible, it should describe one clear issue and make it apparent how fulfillment will later be measured or evaluated. Origin and ownership can also matter so that decisions remain traceable.
Imprecise terms such as “premium,” “intuitive” or “robust” can be useful as directional objectives, but they are often insufficient as technical requirements. The intended effect or measurable state then needs to be defined - for example specified drop tests, task times, life cycles or surface criteria.
Not all requirements have the same importance. Mandatory safety and regulatory criteria cannot be compensated for by design advantages. Other requirements may be strategic priorities or desirable features. Clear prioritization prevents every requirement from being treated as equally important.
Prioritization should also consider dependencies. A more compact product may reduce weight and material while making cooling, service access or assembly more difficult. Good Requirements Analysis therefore looks not only at individual items but at their interactions.
Trade-offs are normal in product design. Lower weight may increase material cost; maximum repairability can affect package space or joint lines; high ingress protection can make disassembly more difficult. The goal is not to eliminate every conflict completely, but to define conscious priorities and trade-offs.
Criteria matrices, engineering assessments, cost models, prototypes or risk analyses can support these decisions. What matters is that the rationale remains documented. Otherwise, later compromises may look like arbitrary deterioration even when they result from a higher-level system decision.
Traceability means being able to follow the origin and subsequent use of a requirement. Ideally, it should be possible to identify the user problem, standard, technical need or business objective from which a requirement arose and the design, engineering or test decision through which it is addressed.
For complex products, this traceability is particularly useful when requirements change. If a component is replaced, for example, it becomes possible to identify which functions, interfaces, tests or regulatory evidence may be affected.
A first reliable requirements baseline should exist before detailed concept development begins. Requirements work is rarely fully complete at that point, however. New findings from prototyping, engineering, testing or supplier coordination can change requirements or reveal additional ones.
Requirements Analysis is therefore iterative. What matters is controlling changes: What changed, why did it change, who decided, and what are the effects on concept, cost, schedule and validation?